{"id":79952,"date":"2026-05-21T10:48:25","date_gmt":"2026-05-21T10:48:25","guid":{"rendered":"https:\/\/dev.baudouin.com\/?post_type=hub&#038;p=79952"},"modified":"2026-06-05T08:02:25","modified_gmt":"2026-06-05T08:02:25","slug":"prime-power-for-data-centers","status":"publish","type":"hub","link":"https:\/\/dev.baudouin.com\/it\/news\/data-center-power\/prime-power-for-data-centers\/","title":{"rendered":"Prime Power for Data Centers"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Why backup power is central to data centre resilience<\/h2>\n\n\n\n<p>In a modern data centre, backup power is not a secondary utility. It is a core resilience system that protects IT continuity, contractual uptime, business-critical applications and service-level performance. If the grid fails, the backup power plant must take over quickly, predictably and repeatedly, without compromising voltage stability or operational continuity.<\/p>\n\n\n\n<p>For this reason, generator sets for data centre applications must be selected and specified against a broader system logic that includes UPS autonomy, switchgear design, redundancy strategy, future capacity growth and plant synchronisation. The right genset is not simply the highest available rating. It is the unit or platform that integrates correctly into the architecture of the facility and performs as expected during real-world transient events.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Baudouin&#8217;s data centre generator range<\/h2>\n\n\n\n<p>Baudouin positions its dedicated data centre gensets in a range from 2000 kVA to 5250 kVA in its launch communication for the sector, while the wider generator-set portfolio extends up to 6250 kVA and the 20M61 now anchors Baudouin&#8217;s hyperscale positioning. This gives project teams a scalable range that can address large enterprise sites, colocation campuses and hyperscale developments within one coherent product family.<\/p>\n\n\n\n<table>\n  <thead>\n    <tr>\n      <th>Product scope<\/th>\n      <th>Published output<\/th>\n      <th>Strategic role<\/th>\n    <\/tr>\n  <\/thead>\n  <tbody>\n    <tr>\n      <td>Dedicated data centre gensets<\/td>\n      <td>2000\u20135250 kVA<\/td>\n      <td>Core range for critical data centre backup power<\/td>\n    <\/tr>\n    <tr>\n      <td>Generator-set portfolio<\/td>\n      <td>Up to 6250 kVA<\/td>\n      <td>Broader high-power positioning across applications<\/td>\n    <\/tr>\n    <tr>\n      <td>20M61 genset<\/td>\n      <td>6250 kVA standby<\/td>\n      <td>Hyperscale backup power and high single-unit capacity<\/td>\n    <\/tr>\n    <tr>\n      <td>PowerKit Diesel engines<\/td>\n      <td>18\u20134125 kVA<\/td>\n      <td>Engine architecture supporting power generation projects<\/td>\n    <\/tr>\n  <\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Why backup power is central to data centre resilience In a modern data centre, backup power is not a secondary utility. It is a core resilience system that protects IT continuity, contractual&#8230;<\/p>\n","protected":false},"author":1,"featured_media":76948,"template":"","meta":{"_acf_changed":false,"content-type":"","ghostkit_customizer_options":"","ghostkit_custom_css":"","ghostkit_custom_js_head":"","ghostkit_custom_js_foot":"","ghostkit_typography":"","footnotes":""},"categories":[286],"tags":[],"hub_tag":[250],"class_list":["post-79952","hub","type-hub","status-publish","has-post-thumbnail","hentry","category-data-center-power","hub_tag-dc-prime-power"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Prime Power for Data Centers - Baudouin<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/\" \/>\n<meta property=\"og:locale\" content=\"it_IT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Prime Power for Data Centers - Baudouin\" \/>\n<meta property=\"og:description\" content=\"Why backup power is central to data centre resilience In a modern data centre, backup power is not a secondary utility. It is a core resilience system that protects IT continuity, contractual...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/\" \/>\n<meta property=\"og:site_name\" content=\"Baudouin\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-05T08:02:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2025\/03\/DC-Gensets-scaled.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo di lettura stimato\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minuti\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/\",\"url\":\"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/\",\"name\":\"Prime Power for Data Centers - Baudouin\",\"isPartOf\":{\"@id\":\"https:\/\/dev.baudouin.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2025\/03\/DC-Gensets-scaled.webp\",\"datePublished\":\"2026-05-21T10:48:25+00:00\",\"dateModified\":\"2026-06-05T08:02:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/#breadcrumb\"},\"inLanguage\":\"it-IT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"it-IT\",\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/#primaryimage\",\"url\":\"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2025\/03\/DC-Gensets-scaled.webp\",\"contentUrl\":\"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2025\/03\/DC-Gensets-scaled.webp\",\"width\":2560,\"height\":1440,\"caption\":\"Camera slowly moving in data center showing server equipment with flickering light indicators, close up view. Seamlessly looped photorealistic 3D render animation.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/dev.baudouin.com\/it\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Prime Power for Data Centers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/dev.baudouin.com\/#website\",\"url\":\"https:\/\/dev.baudouin.com\/\",\"name\":\"Baudouin\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/dev.baudouin.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/dev.baudouin.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"it-IT\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/dev.baudouin.com\/#organization\",\"name\":\"Moteurs Baudouin\",\"alternateName\":\"Moteurs Baudouin\",\"url\":\"https:\/\/dev.baudouin.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"it-IT\",\"@id\":\"https:\/\/dev.baudouin.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/12\/Moteur-Baudouin-jpg.webp\",\"contentUrl\":\"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/12\/Moteur-Baudouin-jpg.webp\",\"width\":150,\"height\":150,\"caption\":\"Moteurs Baudouin\"},\"image\":{\"@id\":\"https:\/\/dev.baudouin.com\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Prime Power for Data Centers - Baudouin","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/","og_locale":"it_IT","og_type":"article","og_title":"Prime Power for Data Centers - Baudouin","og_description":"Why backup power is central to data centre resilience In a modern data centre, backup power is not a secondary utility. It is a core resilience system that protects IT continuity, contractual...","og_url":"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/","og_site_name":"Baudouin","article_modified_time":"2026-06-05T08:02:25+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2025\/03\/DC-Gensets-scaled.webp","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Tempo di lettura stimato":"2 minuti"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/","url":"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/","name":"Prime Power for Data Centers - Baudouin","isPartOf":{"@id":"https:\/\/dev.baudouin.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/#primaryimage"},"image":{"@id":"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/#primaryimage"},"thumbnailUrl":"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2025\/03\/DC-Gensets-scaled.webp","datePublished":"2026-05-21T10:48:25+00:00","dateModified":"2026-06-05T08:02:25+00:00","breadcrumb":{"@id":"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/#breadcrumb"},"inLanguage":"it-IT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/"]}]},{"@type":"ImageObject","inLanguage":"it-IT","@id":"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/#primaryimage","url":"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2025\/03\/DC-Gensets-scaled.webp","contentUrl":"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2025\/03\/DC-Gensets-scaled.webp","width":2560,"height":1440,"caption":"Camera slowly moving in data center showing server equipment with flickering light indicators, close up view. Seamlessly looped photorealistic 3D render animation."},{"@type":"BreadcrumbList","@id":"https:\/\/dev.baudouin.com\/news\/data-center-power\/prime-power-for-data-centers\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dev.baudouin.com\/it\/"},{"@type":"ListItem","position":2,"name":"Prime Power for Data Centers"}]},{"@type":"WebSite","@id":"https:\/\/dev.baudouin.com\/#website","url":"https:\/\/dev.baudouin.com\/","name":"Baudouin","description":"","publisher":{"@id":"https:\/\/dev.baudouin.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dev.baudouin.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"it-IT"},{"@type":"Organization","@id":"https:\/\/dev.baudouin.com\/#organization","name":"Moteurs Baudouin","alternateName":"Moteurs Baudouin","url":"https:\/\/dev.baudouin.com\/","logo":{"@type":"ImageObject","inLanguage":"it-IT","@id":"https:\/\/dev.baudouin.com\/#\/schema\/logo\/image\/","url":"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/12\/Moteur-Baudouin-jpg.webp","contentUrl":"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/12\/Moteur-Baudouin-jpg.webp","width":150,"height":150,"caption":"Moteurs Baudouin"},"image":{"@id":"https:\/\/dev.baudouin.com\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/dev.baudouin.com\/it\/wp-json\/wp\/v2\/hub\/79952","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.baudouin.com\/it\/wp-json\/wp\/v2\/hub"}],"about":[{"href":"https:\/\/dev.baudouin.com\/it\/wp-json\/wp\/v2\/types\/hub"}],"author":[{"embeddable":true,"href":"https:\/\/dev.baudouin.com\/it\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":8,"href":"https:\/\/dev.baudouin.com\/it\/wp-json\/wp\/v2\/hub\/79952\/revisions"}],"predecessor-version":[{"id":79975,"href":"https:\/\/dev.baudouin.com\/it\/wp-json\/wp\/v2\/hub\/79952\/revisions\/79975"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dev.baudouin.com\/it\/wp-json\/wp\/v2\/media\/76948"}],"wp:attachment":[{"href":"https:\/\/dev.baudouin.com\/it\/wp-json\/wp\/v2\/media?parent=79952"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev.baudouin.com\/it\/wp-json\/wp\/v2\/categories?post=79952"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.baudouin.com\/it\/wp-json\/wp\/v2\/tags?post=79952"},{"taxonomy":"hub_tag","embeddable":true,"href":"https:\/\/dev.baudouin.com\/it\/wp-json\/wp\/v2\/hub_tag?post=79952"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}