{"id":79979,"date":"2026-06-18T19:27:03","date_gmt":"2026-06-18T19:27:03","guid":{"rendered":"https:\/\/dev.baudouin.com\/?p=79979"},"modified":"2026-06-19T07:09:43","modified_gmt":"2026-06-19T07:09:43","slug":"powering-ai-workloads-in-modern-data-centres","status":"publish","type":"post","link":"https:\/\/dev.baudouin.com\/fr\/news\/data-centre-power\/prime-power-for-data-centres\/powering-ai-workloads-in-modern-data-centres\/","title":{"rendered":"Powering AI Workloads in Modern Data Centres"},"content":{"rendered":"\n<p>AI-ready data centres require backup power systems that combine high unit capacity, strong transient response, resilient architecture and scalable deployment logic. Baudouin states that its data centre generator range supports AI, HPC and cloud infrastructures with unit ratings up to 6250 kVA, including the 20M61, while also aligning its offer with Uptime Institute and TIA-942B expectations and ISO 8528-5 G3 performance class standards.<\/p>\n\n\n\n<p>In practice, AI and HPC workloads change what operators should expect from backup power. Higher rack densities, larger synchronous load blocks and more demanding cooling continuity make generator sizing, transient behaviour and redundancy planning more critical than in conventional enterprise facilities.<\/p>\n\n\n\n<p><strong>How AI workloads change backup power requirements<\/strong><\/p>\n\n\n\n<p>Artificial intelligence and high-performance computing concentrate more processing power into fewer racks and denser clusters. This increases both total power demand and the size of step-load events that the backup power system must absorb. In a modern AI data centre, the generator is not just an emergency asset; it is part of the broader resilience architecture that protects compute continuity, cooling systems and service-level commitments.<\/p>\n\n\n\n<p>This matters because AI workloads create a more dynamic electrical environment than traditional enterprise IT. As density rises, any weakness in transient response, frequency stability or recovery time becomes more visible to the critical load.<\/p>\n\n\n\n<table>\n  <thead>\n    <tr>\n      <th>Workload type<\/th>\n      <th>Typical power profile<\/th>\n      <th>Backup power implication<\/th>\n    <\/tr>\n  <\/thead>\n  <tbody>\n    <tr>\n      <td>Traditional enterprise IT<\/td>\n      <td>Moderate density, smaller load blocks<\/td>\n      <td>Lower unit ratings and less demanding transient events<\/td>\n    <\/tr>\n    <tr>\n      <td>Cloud and virtualised infrastructure<\/td>\n      <td>Higher utilisation, more scalable demand<\/td>\n      <td>More frequent transitions and stronger redundancy planning<\/td>\n    <\/tr>\n    <tr>\n      <td>AI and HPC clusters<\/td>\n      <td>Very high density, large synchronous loads<\/td>\n      <td>Higher power density, stronger transient response and tighter resilience requirements<\/td>\n    <\/tr>\n  <\/tbody>\n<\/table>\n\n\n\n<p><strong>Why high unit ratings matter for AI data centres<\/strong><\/p>\n\n\n\n<p>One of the clearest effects of AI growth is the need for higher power density at generator level. Baudouin highlights that its data centre genset range extends up to 6250 kVA per unit with the 20M61, and positions this capability for hyperscale and colocation environments where large digital loads must be protected with fewer, more powerful machines.<\/p>\n\n\n\n<p>This matters because high unit ratings can reduce the number of gensets required in a plant, which can simplify layout, synchronisation logic and maintenance planning when the broader architecture is correctly engineered.<\/p>\n\n\n\n<p><strong>Why transient response is critical for HPC infrastructure<\/strong><\/p>\n\n\n\n<p>For HPC infrastructure, backup power quality matters as much as backup power availability. Baudouin&rsquo;s resilience messaging states that its PowerKit solutions deliver the transient response required to keep cooling systems active and IT loads stable, which directly addresses one of the main constraints of high-density AI and HPC environments.<\/p>\n\n\n\n<p>This is where ISO 8528-5 G3 becomes especially relevant. Baudouin states that its data centre gensets are manufactured according to ISO 8528-5 G3 performance class standards, and its public messaging around data centre applications also highlights strong load acceptance and voltage-frequency stability.<\/p>\n\n\n\n<p><strong>How Baudouin positions its gensets for AI, HPC and cloud infrastructures<\/strong><\/p>\n\n\n\n<p>Baudouin explicitly states that its gensets are designed to meet the growing energy demands of AI, HPC and cloud infrastructures. This is a strong positioning signal because it ties together capacity, transient performance and application relevance in one public narrative.<\/p>\n\n\n\n<p>Baudouin also combines this application-level language with technical and strategic signals: Uptime Institute and TIA-942B positioning for Tier III and Tier IV environments, ISO 8528-5 G3 manufacturing standards, HVO EN15940 compatibility and high single-unit output up to 6250 kVA.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>AI-ready data centres require backup power systems that combine high unit capacity, strong transient response, resilient architecture and scalable deployment logic. Baudouin states that its data centre generator range supports AI, HPC&#8230;<\/p>\n","protected":false},"author":14,"featured_media":69923,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","ghostkit_customizer_options":"","ghostkit_custom_css":"","ghostkit_custom_js_head":"","ghostkit_custom_js_foot":"","ghostkit_typography":"","footnotes":""},"categories":[286],"tags":[],"hub_tag":[],"class_list":["post-79979","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-data-centre-power"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Powering AI Workloads in Modern Data Centres - Baudouin<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Powering AI Workloads in Modern Data Centres - Baudouin\" \/>\n<meta property=\"og:description\" content=\"AI-ready data centres require backup power systems that combine high unit capacity, strong transient response, resilient architecture and scalable deployment logic. Baudouin states that its data centre generator range supports AI, HPC...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/\" \/>\n<meta property=\"og:site_name\" content=\"Baudouin\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-18T19:27:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T07:09:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/03\/Enerkit-Data-Center-destop.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Matthieu LADIRAY\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Matthieu LADIRAY\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/\"},\"author\":{\"name\":\"Matthieu LADIRAY\",\"@id\":\"https:\/\/dev.baudouin.com\/#\/schema\/person\/8b4a174e2bc18f8332793eac670deda7\"},\"headline\":\"Powering AI Workloads in Modern Data Centres\",\"datePublished\":\"2026-06-18T19:27:03+00:00\",\"dateModified\":\"2026-06-19T07:09:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/\"},\"wordCount\":565,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/dev.baudouin.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/03\/Enerkit-Data-Center-destop.png\",\"articleSection\":[\"Data Centre Power\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/\",\"url\":\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/\",\"name\":\"Powering AI Workloads in Modern Data Centres - Baudouin\",\"isPartOf\":{\"@id\":\"https:\/\/dev.baudouin.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/03\/Enerkit-Data-Center-destop.png\",\"datePublished\":\"2026-06-18T19:27:03+00:00\",\"dateModified\":\"2026-06-19T07:09:43+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#primaryimage\",\"url\":\"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/03\/Enerkit-Data-Center-destop.png\",\"contentUrl\":\"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/03\/Enerkit-Data-Center-destop.png\",\"width\":1000,\"height\":1000},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/dev.baudouin.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Powering AI Workloads in Modern Data Centres\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/dev.baudouin.com\/#website\",\"url\":\"https:\/\/dev.baudouin.com\/\",\"name\":\"Baudouin\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/dev.baudouin.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/dev.baudouin.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/dev.baudouin.com\/#organization\",\"name\":\"Moteurs Baudouin\",\"alternateName\":\"Moteurs Baudouin\",\"url\":\"https:\/\/dev.baudouin.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/dev.baudouin.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/12\/Moteur-Baudouin-jpg.webp\",\"contentUrl\":\"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/12\/Moteur-Baudouin-jpg.webp\",\"width\":150,\"height\":150,\"caption\":\"Moteurs Baudouin\"},\"image\":{\"@id\":\"https:\/\/dev.baudouin.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/dev.baudouin.com\/#\/schema\/person\/8b4a174e2bc18f8332793eac670deda7\",\"name\":\"Matthieu LADIRAY\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/dev.baudouin.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ef5c46df037dc947a6bcb65704a32710?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ef5c46df037dc947a6bcb65704a32710?s=96&d=mm&r=g\",\"caption\":\"Matthieu LADIRAY\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Powering AI Workloads in Modern Data Centres - Baudouin","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/","og_locale":"fr_FR","og_type":"article","og_title":"Powering AI Workloads in Modern Data Centres - Baudouin","og_description":"AI-ready data centres require backup power systems that combine high unit capacity, strong transient response, resilient architecture and scalable deployment logic. Baudouin states that its data centre generator range supports AI, HPC...","og_url":"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/","og_site_name":"Baudouin","article_published_time":"2026-06-18T19:27:03+00:00","article_modified_time":"2026-06-19T07:09:43+00:00","og_image":[{"width":1000,"height":1000,"url":"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/03\/Enerkit-Data-Center-destop.png","type":"image\/png"}],"author":"Matthieu LADIRAY","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Matthieu LADIRAY","Dur\u00e9e de lecture estim\u00e9e":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#article","isPartOf":{"@id":"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/"},"author":{"name":"Matthieu LADIRAY","@id":"https:\/\/dev.baudouin.com\/#\/schema\/person\/8b4a174e2bc18f8332793eac670deda7"},"headline":"Powering AI Workloads in Modern Data Centres","datePublished":"2026-06-18T19:27:03+00:00","dateModified":"2026-06-19T07:09:43+00:00","mainEntityOfPage":{"@id":"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/"},"wordCount":565,"commentCount":0,"publisher":{"@id":"https:\/\/dev.baudouin.com\/#organization"},"image":{"@id":"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#primaryimage"},"thumbnailUrl":"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/03\/Enerkit-Data-Center-destop.png","articleSection":["Data Centre Power"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/","url":"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/","name":"Powering AI Workloads in Modern Data Centres - Baudouin","isPartOf":{"@id":"https:\/\/dev.baudouin.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#primaryimage"},"image":{"@id":"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#primaryimage"},"thumbnailUrl":"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/03\/Enerkit-Data-Center-destop.png","datePublished":"2026-06-18T19:27:03+00:00","dateModified":"2026-06-19T07:09:43+00:00","breadcrumb":{"@id":"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#primaryimage","url":"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/03\/Enerkit-Data-Center-destop.png","contentUrl":"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/03\/Enerkit-Data-Center-destop.png","width":1000,"height":1000},{"@type":"BreadcrumbList","@id":"https:\/\/dev.baudouin.com\/news\/data-centre-power\/prime-power-for-data-centers\/powering-ai-workloads-in-modern-data-centres\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dev.baudouin.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Powering AI Workloads in Modern Data Centres"}]},{"@type":"WebSite","@id":"https:\/\/dev.baudouin.com\/#website","url":"https:\/\/dev.baudouin.com\/","name":"Baudouin","description":"","publisher":{"@id":"https:\/\/dev.baudouin.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dev.baudouin.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/dev.baudouin.com\/#organization","name":"Moteurs Baudouin","alternateName":"Moteurs Baudouin","url":"https:\/\/dev.baudouin.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/dev.baudouin.com\/#\/schema\/logo\/image\/","url":"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/12\/Moteur-Baudouin-jpg.webp","contentUrl":"https:\/\/dev.baudouin.com\/wp-content\/uploads\/2024\/12\/Moteur-Baudouin-jpg.webp","width":150,"height":150,"caption":"Moteurs Baudouin"},"image":{"@id":"https:\/\/dev.baudouin.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/dev.baudouin.com\/#\/schema\/person\/8b4a174e2bc18f8332793eac670deda7","name":"Matthieu LADIRAY","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/dev.baudouin.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/ef5c46df037dc947a6bcb65704a32710?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ef5c46df037dc947a6bcb65704a32710?s=96&d=mm&r=g","caption":"Matthieu LADIRAY"}}]}},"_links":{"self":[{"href":"https:\/\/dev.baudouin.com\/fr\/wp-json\/wp\/v2\/posts\/79979","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.baudouin.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dev.baudouin.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dev.baudouin.com\/fr\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.baudouin.com\/fr\/wp-json\/wp\/v2\/comments?post=79979"}],"version-history":[{"count":2,"href":"https:\/\/dev.baudouin.com\/fr\/wp-json\/wp\/v2\/posts\/79979\/revisions"}],"predecessor-version":[{"id":79990,"href":"https:\/\/dev.baudouin.com\/fr\/wp-json\/wp\/v2\/posts\/79979\/revisions\/79990"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dev.baudouin.com\/fr\/wp-json\/wp\/v2\/media\/69923"}],"wp:attachment":[{"href":"https:\/\/dev.baudouin.com\/fr\/wp-json\/wp\/v2\/media?parent=79979"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev.baudouin.com\/fr\/wp-json\/wp\/v2\/categories?post=79979"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.baudouin.com\/fr\/wp-json\/wp\/v2\/tags?post=79979"},{"taxonomy":"hub_tag","embeddable":true,"href":"https:\/\/dev.baudouin.com\/fr\/wp-json\/wp\/v2\/hub_tag?post=79979"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}